Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Clark F Morris wrote:
.....Also I can see the press dumping on Network Rail for delays that are caused by Crossrail construction that may not be under the control of Network Rail and calls for penalties for things which Crossrail has no control over. I don't think the work on the existing network is outside NR control, it has been delegated to Network Rail to organise, with a £2.5 billion slice of the budget being allocated. Paul |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Delay HS2’s (London) Euston plans, says ex-civil service head | London Transport | |||
Man fighting for life after being hit in the head by Tube train in horrific accident at Stockwell station | London Transport | |||
Heathrow T5 - another head rolls | London Transport | |||
Above or Below Ground??? | London Transport | |||
does the tube come above ground at all? | London Transport |