When is this supposed to be completed, I was told it was running over
& should have been finished last November ? |
#2
![]() |
|||
|
|||
![]()
On 18 May, 22:46, martyn dawe wrote:
When is this supposed to be completed, I was told it was running over & should have been finished last November ? Works will be ongoing until the end of the year. The original advertised works, with early weekday closures as well, finished in November allowing full use of the line in the run up to Christmas. However, there was always going to be further weekend closures throughout 2009, whilst the new signalling was finished/commissioned and the new trains commissioned. There is a link (http:// www.tfl.gov.uk/assets/livetravelnews/realtime/tube/track-closures.pdf) on the TfL website showing all the planned closures for the next 6 months (although it seems to run April to September), at least they seem to be avoiding having both the Victoria and District lines shut at Victoria on the same days. I did see some notices about the closure patterns through to 2009, right at the start of works. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
"Air Line" (Thames Cable Car) construction works | London Transport | |||
Victoria Tube station escalator works finished | London Transport | |||
Victoria Underground works approved | London Transport | |||
Line-side works, Hillingdon-Uxbridge | London Transport | |||
East London Line Extensionmain works contracts awarded | London Transport |