Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#1
![]() |
|||
|
|||
![]()
I'm not going to say /too/ much here until publishing actual reports-
I'm-paid-to-write, but in response to some key things raised: 1) the only people involved significantly onsite at present are infrastructure types from TfL infrastructure and BBCJV, not ops types from LO and LOROL, so none of the ops questions were relevant. 2) there is quite a lot of building work still to do, particularly at Dalston (where they still haven't finished laying the large slabs above the platforms that will support the bus station) 3) however, everyone involved explicitly and repeatedly said that they would difficultly-but-comfortably make the January 17 deadline for TfL and BBCJV to hand over an operational railway to LOROL to start running test trains on. (*my opinion, not reporting*: I don't think they will achieve handover any earlier than this. While many of the stations from Whitechapel south just need fit-out and tinkering, Dalston and SHS are still basically half-built. Whether achieving the January 17 deadline will allow opening earlier than mid-June is another question, and my day job is construction writing not rail operation. How long was the gap between the advent of fully signalled, OH powered test E*s on HS1 and its opening?) 4) the new stations appear to be sensibly futureproofed length-wise: the 4 platforms at DJ are the same length, give or take 5ish metres, and although the major building work still going on at the south end of DJ made it impossible to reach the far end I'd be very surprised if they weren't all 6-car. I've not seen the claim that the bay platforms are 4-car made anywhere 'official' rather than blogs/fora - anyone know otherwise? SHS is 8-car. 5) SHS will be like St Pancras Thameslink inside. At the moment there are several bits that haven't been finished and hence let light in; when it's done there won't be any. Near-total soundproofing is required given the building site that (hopefully, economy willing) will surround it. 6) Rotherhithe is going to look pretty cool at ticket hall level, with the frontage restored and replicas of the original columns added, and a new split-level glass roof replacing the 80s perspex over the escalators. At platform level there's a new emergency exit to the south of the platforms, but the only platform widening is based on narrowing the loading gauge from Met to NR and the main access hasn't been improved significantly (same at Wapping). 7) While I know naff-all about depots, the depot looks nearly ready and rather impressive. It'll do up to C4 servicing, with anything that can't be done there done in Derby (ie ELL trains won't need to leave the ELL for routine maintenance). It will also perform some heavy maintenance on NLL/WLL trains and so has various AC-related test equipment for them. I'll post links to articles & photos when they're up. -- John Band john at johnband dot org www.johnband.org |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
West Anglia Main Line Progress Report - DfT | London Transport | |||
West Anglia Main Line Progress Report - DfT | London Transport | |||
East London Line Progress Update | London Transport | |||
Anyone know about East London Line Project progress? | London Transport | |||
East London Line Progress | London Transport |