Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#7
![]() |
|||
|
|||
![]()
In message , at 15:38:45 on
Tue, 11 Aug 2009, Recliner remarked: "Roland Perry" wrote in message In message , at 14:42:18 on Tue, 11 Aug 2009, Recliner remarked: Sorry - not sure exactly what they're called, but why is it only the SSL and Overground that are to get trains that you can walk all the way through (like a bendy bus)? I thought there were plans for such trains in the Underground (the ex-Metrolink contract). I think the 2009 Victoria line trains are the only tube trains ordered by Metronet. There originally seemed to be bigger plans, for more new trains. Not that I can recall. The Bakerloo is the only other Metronet line with old trains, but they're not due for replacement for a few years yet. Had Metronet remained in its original form, I'm sure these would just have been follow-ons from the Bombardier 2009 stock (rather like the Met-Cam 1972 stock was based on the 1967 TS), but TfL is much more likely to put it out to tender. I assume Tube Lines will also put the Piccadilly replacement stock out to tender, but not just yet -- perhaps the 1972 and 1973 replacements will be a single new stock, much as the S stock replaces the A, C and D stocks. Conceivably, Bombardier could win both those contracts as well, but Alston, for one, is likely to be keen to bid. As mentioned upthread, for reasons of tight space and twisty track, I think it highly unlikely that any LU tube stock will have walk-through inter-car connections. After all, just think how narrow and low the doorways would have to be! "Since Metronet's collapse London Underground claims to have saved £2.5bn through the renegotiation of contracts, revising the upgrade programme, better procurement and operational efficiencies. This new work will be complemented by a fleet of 191 new air-conditioned walk through trains. It will mean passengers will experience a more reliable service, with 50% greater capacity." http://www.contractjournal.com/Artic.../70166/london- underground-re-tenders-mammoth-metronet-signalling-job.html Or are those SSL? -- Roland Perry |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Why isn't the 2009 stock walk through like the S stock? | London Transport | |||
Ian Jelf: Shameless Plug for Free Walk | London Transport | |||
31 Minutes to walk from Kings Cross to St. Pancreas - Is this true!? | London Transport | |||
TfL Journey Planner - how dare you walk, while we use your money to fill the streets with empty buses! | London Transport | |||
SWT Trains through East Putney today | London Transport |