Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#11
![]() |
|||
|
|||
![]()
On Tue, 11 Aug 2009 09:32:36 -0700 (PDT)
John B wrote: True, or at least "true so 'tis claimed". I imagine that squishing a 2009-stock to fit the Bakerloo loading gauge and adjusting the equipment used to produce the 2009 stock to produce the squished stock would be significantly easier than designing a Tube gauge train and setting up a production line from scratch, though. If apparently the 09 stock did get dragged through the piccadilly line tunnels without incident then we can't be talking much difference between 09 and other tube stocks can we? Maybe a few centimeters one way or the other at most which surely wouldn't make much difference to equipment? Its not like a train builder having to squash a UIC loading gauge train by 6 inches width and a foot in height to fit the UKs hopeless mainline loading gauge. B2003 |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Why isn't the 2009 stock walk through like the S stock? | London Transport | |||
Ian Jelf: Shameless Plug for Free Walk | London Transport | |||
31 Minutes to walk from Kings Cross to St. Pancreas - Is this true!? | London Transport | |||
TfL Journey Planner - how dare you walk, while we use your money to fill the streets with empty buses! | London Transport | |||
SWT Trains through East Putney today | London Transport |