Does anyone know the (new) date for the start of work to put 2 more
platforms at Marylebone. It should be finished by now -- To reply direct, remove NOSPAM and replace with railwaysonline For Train Information, The Latest News & Best photos around check out the Award Winning Railways Online at http://www.railwaysonline.co.uk |
#2
![]() |
|||
|
|||
![]() "Joe" wrote in message ... Does anyone know the (new) date for the start of work to put 2 more platforms at Marylebone. It should be finished by now It won't happen until the new depot at Wembley has been completed, to allow some stabling to be transferred to there. |
#3
![]() |
|||
|
|||
![]()
"Jack Taylor" wrote in message
... It won't happen until the new depot at Wembley has been completed, to allow some stabling to be transferred to there. And when might that be completed? Aylesbury depot is still looking a shambles. I saw 1 car of the 117 detach and pull off toward Quainton yesterday. Quite an odd sight to see one of those again.... -- To reply direct, remove NOSPAM and replace with railwaysonline For Train Information, The Latest News & Best photos around check out the Award Winning Railways Online at http://www.railwaysonline.co.uk |
#4
![]() |
|||
|
|||
![]() "Joe" wrote in message ... "Jack Taylor" wrote in message ... It won't happen until the new depot at Wembley has been completed, to allow some stabling to be transferred to there. And when might that be completed? Aylesbury depot is still looking a shambles. I saw 1 car of the 117 detach and pull off toward Quainton yesterday. Quite an odd sight to see one of those again.... AIUI the groundwork is due to commence imminently and involves some embankment construction to protect local residents from noise. However, if it takes as long to complete as the extension to Aylesbury depot has taken then don't hold your breath!!! That said, I had a look around the depot the other week and the new wheel lathe (on 'E' road) is quite an impressive piece of kit. On a subsidiary topic (which you have raised before) I was told last week that the installation of UTS gates at Aylesbury has now been cancelled due to the cost. |
#5
![]() |
|||
|
|||
![]()
On a subsidiary topic (which you have raised before) I was told last week
that the installation of UTS gates at Aylesbury has now been cancelled due to the cost. It has been postponed (as everyone at the station says), the current building work at the station is for a Drivers room/Staff Lockers etc. ISTR that they will not be active until easter (at the earliest) -- To reply direct, remove NOSPAM and replace with railwaysonline For Train Information, The Latest News & Best photos around check out the Award Winning Railways Online at http://www.railwaysonline.co.uk |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Bank Station enlargement | London Transport | |||
Marylebone (LU) - Marylebone (NR) : Valid OOS Oyster interchange ? | London Transport | |||
Chiltern line at Marylebone this Evening | London Transport | |||
Marylebone Tube Closed Morning Rush Hour | London Transport | |||
Marylebone Tube Closed Morning Rush Hour | London Transport |