Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#5
![]() |
|||
|
|||
![]()
In article ,
"Paul Scott" wrote: I don't think there are any significant gauging issues there - I suspect the only practical thing keeping diverted passenger services off the route would be lack of capacity - it is intended to run the 16 tph 7/7. But in dire emergency you wouldn't think there'd be a problem getting at least any other DC Electrostar variant through. I think if they'd had a bit more cash they could have at least added a third line along the stretch from Dalston to wherever possible southwards - after all that trackbed used to have four tracks - I think? E. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Class 700 ETCS level 2 tested in Thameslink core | London Transport | |||
The East London Line is dead... Long live the East London Line | London Transport | |||
First Class in the south east | London Transport | |||
First Class in the South East | London Transport |