Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
|
#1
![]() |
|||
|
|||
![]()
Roland Perry wrote in message ...
In message , Geoff Marshall writes In answer to your enquiry, Terminal 4 station is expected to be closed from January 2005 for around 20 months, to allow construction of a junction in the area to extend the Piccadilly Line to Terminal 5. Is the junction being built by one man and a dog (and only the man has a shovel)?? Almost two years, to build a junction??? Why is anyone surprised? This is par for the course with anything to do with london underground (and frankly britain in general these days). There are probably so many legal, contractual and health and safety hoops to jump through its a wonder anything gets done at all sometimes. Anyway , bear in mind this is the same organisation that had to close the central line for months and takes 6 months to get a single escalator rebuilt. B2003 |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Cablecars to link close stations? | London Transport | |||
Central Line To Close (again) | London Transport | |||
LU to close Waterloo&City line to save money. | London Transport | |||
Thameslink to close Between Kentish Town & Blackfriars | London Transport | |||
Thameslink to close Between Kentish Town & Blackfriars | London Transport |