Home |
Search |
Today's Posts |
![]() |
|
London Transport (uk.transport.london) Discussion of all forms of transport in London. |
|
LinkBack | Thread Tools | Display Modes |
#16
![]() |
|||
|
|||
![]()
In article ,
(Paul Scott) wrote: Latest report is that normal service will resume tomorrow morning: http://www.southwesttrains.co.uk/eng...a1d1349548b8fa aad06\961215 Network Rail's press release shows the track work in progress, I can't work out from the pic if they've laid two tracks or just the one. Can anyone clarify? http://www.networkrailmediacentre.co...eleaseID=4827& NewsA\reaID=2&SearchCategoryID=8 That page includes this text: "Network Rail engineers will continue to work around the clock and over the weekend to design and build a small, temporary loop around the section of track above the damaged arch on the adjacent land which was once occupied by the Feltham marshalling yard. This will allow trains to cross the river safely while repairs to the permanent structure are carried out." If you look at the full size picture (on the download link) you can see more clearly that the track has been slewed. -- Colin Rosenstiel |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Changes at Feltham | London Transport | |||
SWT Closes Platform 1 Entrance/Exit at Feltham at 23.00 | London Transport | |||
Disruption between Feltham and Twickenham today (and for a long period thereafter) | London Transport | |||
Relaunched trivia: Unusual vehicles at Feltham Goods Yard | London Transport | |||
DLR Service Disruption | London Transport |